Difference between revisions of "Project Dandelion"

From Hackstrich
(Cosmetic steps.)
 
(6 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
Project Dandelion is the restoration of a Xerox Star 8010 (Dandelion) machine I have into working condition.
 
Project Dandelion is the restoration of a Xerox Star 8010 (Dandelion) machine I have into working condition.
 +
 +
'''Main work log and documentation are on my [http://dandelion.sen.cx Dandelion restoration page]'''
 +
'''This page is mostly out of date and not maintained as I figure out what to keep here.'''
  
 
== Project Status ==
 
== Project Status ==
 
* A detailed [[Project Dandelion/Work Log|Work Log]] is being kept as I work on this project.
 
* A detailed [[Project Dandelion/Work Log|Work Log]] is being kept as I work on this project.
* <b>Cosmetic:</b> Basic cleanup work done, loose foam vacuumed out. Much work still to be done.
+
* Next steps: Pull out the PSU and start inspecting it.
* <b>Documentation:</b> Initial internal photos of chassis taken.
+
* <b>Cosmetic:</b> Basic cleanup work done, loose foam vacuumed out, bottom cover wirebrushed and repainted. Much work still to be done.
 +
* <b>Documentation:</b> Initial internal photos of chassis taken, cable routing photos taken.  Wiring harness schematic is being put together as cables are being disconnected.
 
* <b>Power Supply/Distribution:</b> Power distribution board reversed into a schematic.  Lots more wire tracing needs to be done.
 
* <b>Power Supply/Distribution:</b> Power distribution board reversed into a schematic.  Lots more wire tracing needs to be done.
 
* <b>Fans:</b> Not started.
 
* <b>Fans:</b> Not started.
 
* <b>Backplane/Cabling:</b> Not started.
 
* <b>Backplane/Cabling:</b> Not started.
* <b>Maintenance Panel/RTC/etc.:</b> Not started.
+
* <b>Maintenance Panel/RTC/etc.:</b> Checks out, all functions work as documented.
 
* <b>Central Processor Card (CP):</b> Not started.
 
* <b>Central Processor Card (CP):</b> Not started.
 
* <b>Memory Storage Card (MSC):</b> Not started.
 
* <b>Memory Storage Card (MSC):</b> Not started.
Line 26: Line 30:
 
* All loose paper/foam/etc. that could be removed without removing any parts has been removed.
 
* All loose paper/foam/etc. that could be removed without removing any parts has been removed.
 
* Fan retention bracket has been removed and wire brushed to remove all rust.
 
* Fan retention bracket has been removed and wire brushed to remove all rust.
 +
* Bottom cover has been removed, wirebrushed to remove all old paint and rust, painted, and reinstalled.
  
 
== Documentation ==
 
== Documentation ==
 
* [http://sarahemm.net/gallery/v/projects/dandelion/initial_internal/ Initial photos of chassis] taken with panels taken off, no parts removed/disconnected yet.
 
* [http://sarahemm.net/gallery/v/projects/dandelion/initial_internal/ Initial photos of chassis] taken with panels taken off, no parts removed/disconnected yet.
 
* [[Project Dandelion/Power System|Power System]] documentation
 
* [[Project Dandelion/Power System|Power System]] documentation
 +
* [[Project Dandelion/Maintenance Panel|Maintenance Panel]] documentation
  
 
== Power Supply/Distribution ==
 
== Power Supply/Distribution ==
 
* Schematic created of power distribution board, will be put into Hackstrich SVN shortly.
 
* Schematic created of power distribution board, will be put into Hackstrich SVN shortly.
 +
 +
== Maintenance Panel ==
 +
* Complete functionality tested, all working OK.
  
 
== Resources ==
 
== Resources ==
Line 40: Line 49:
 
[[Category:Retrocomputing]]
 
[[Category:Retrocomputing]]
 
[[Category:Project Dandelion]]
 
[[Category:Project Dandelion]]
 +
/b> Not started.
 +
*

Latest revision as of 02:44, 14 June 2015

Project Dandelion is the restoration of a Xerox Star 8010 (Dandelion) machine I have into working condition.

Main work log and documentation are on my Dandelion restoration page This page is mostly out of date and not maintained as I figure out what to keep here.

Project Status

  • A detailed Work Log is being kept as I work on this project.
  • Next steps: Pull out the PSU and start inspecting it.
  • Cosmetic: Basic cleanup work done, loose foam vacuumed out, bottom cover wirebrushed and repainted. Much work still to be done.
  • Documentation: Initial internal photos of chassis taken, cable routing photos taken. Wiring harness schematic is being put together as cables are being disconnected.
  • Power Supply/Distribution: Power distribution board reversed into a schematic. Lots more wire tracing needs to be done.
  • Fans: Not started.
  • Backplane/Cabling: Not started.
  • Maintenance Panel/RTC/etc.: Checks out, all functions work as documented.
  • Central Processor Card (CP): Not started.
  • Memory Storage Card (MSC): Not started.
  • Memory Control Card (MCC): Not started.
  • High Speed I/O Card (HSIO): Not started.
  • Low Speed I/O Processor Card (IOP): Not started.
  • Raven/Ethernet Option Card (OPT): Not started.
  • Monitor: Not started.
  • Keyboard: Not started.
  • Flexible Disk: Not started.
  • Rigid Disk: Not started.
  • Full bootup: Not started.

Cosmetic

  • Exterior case in good condition, interior has some rust damage and mice have stolen bits of foam/paper to make a nest elsewhere.
  • Loose/crumbling foam vacuumed out.
  • All loose paper/foam/etc. that could be removed without removing any parts has been removed.
  • Fan retention bracket has been removed and wire brushed to remove all rust.
  • Bottom cover has been removed, wirebrushed to remove all old paint and rust, painted, and reinstalled.

Documentation

Power Supply/Distribution

  • Schematic created of power distribution board, will be put into Hackstrich SVN shortly.

Maintenance Panel

  • Complete functionality tested, all working OK.

Resources

/b> Not started.