  • Photographed whole chassis before removing/disconnecting any parts. Cleaned out all loose paper/foam/etc. Started identifying major components and what the purpose of each is. Photos available in Initial Internal Photos gallery.
  • Removed and wirebrushed card cage fan retention bracket.
  • Reverse engineered a schematic for the power distribution board and created an EAGLE schematic for it.

2010-04-04

  • Did a lot of wiring harness tracing, added to schematic. Removed any wiring that could be removed once it was traced/documented. Took photos of all wire routing (not yet uploaded) so that I can hopefully re-route it the same once it goes back in.
  • Removed maintenance panel board for reverse-engineering.