Project Dandelion/Work Log

From Hackstrich
Revision as of 01:27, 3 April 2010 by SarahEmm (talk | contribs) (RE'd the PD board.)

2010-04-02

  • Photographed whole chassis before removing/disconnecting any parts. Cleaned out all loose paper/foam/etc. Started identifying major components and what the purpose of each is. Photos available in Initial Internal Photos gallery.
  • Removed and wirebrushed card cage fan retention bracket.
  • Reverse engineered a schematic for the power distribution board and created an EAGLE schematic for it.