* Removed and wirebrushed card cage fan retention bracket. | * Removed and wirebrushed card cage fan retention bracket. | ||
* Reverse engineered a schematic for the power distribution board and created an EAGLE schematic for it. | * Reverse engineered a schematic for the power distribution board and created an EAGLE schematic for it. | ||
+ | |||
+ | == 2010-04-04 == | ||
+ | * Did a lot of wiring harness tracing, added to schematic. Removed any wiring that could be removed once it was traced/documented. Took photos of all wire routing (not yet uploaded) so that I can hopefully re-route it the same once it goes back in. | ||
+ | * Removed maintenance panel board for reverse-engineering. | ||
+ | |||
[[Category:Project Dandelion]] | [[Category:Project Dandelion]] |
Revision as of 00:07, 5 April 2010
2010-04-02
- Photographed whole chassis before removing/disconnecting any parts. Cleaned out all loose paper/foam/etc. Started identifying major components and what the purpose of each is. Photos available in Initial Internal Photos gallery.
- Removed and wirebrushed card cage fan retention bracket.
- Reverse engineered a schematic for the power distribution board and created an EAGLE schematic for it.
2010-04-04
- Did a lot of wiring harness tracing, added to schematic. Removed any wiring that could be removed once it was traced/documented. Took photos of all wire routing (not yet uploaded) so that I can hopefully re-route it the same once it goes back in.
- Removed maintenance panel board for reverse-engineering.