Difference between revisions of "Project Dandelion/Work Log"

From Hackstrich
(Updating log with work done and reformatted.)
(RE'd the PD board.)
Line 2: Line 2:
 
* Photographed whole chassis before removing/disconnecting any parts.  Cleaned out all loose paper/foam/etc.  Started identifying major components and what the purpose of each is.  Photos available in [http://sarahemm.net/gallery/v/projects/dandelion/initial_internal/ Initial Internal Photos gallery].
 
* Photographed whole chassis before removing/disconnecting any parts.  Cleaned out all loose paper/foam/etc.  Started identifying major components and what the purpose of each is.  Photos available in [http://sarahemm.net/gallery/v/projects/dandelion/initial_internal/ Initial Internal Photos gallery].
 
* Removed and wirebrushed card cage fan retention bracket.
 
* Removed and wirebrushed card cage fan retention bracket.
 +
* Reverse engineered a schematic for the power distribution board and created an EAGLE schematic for it.
  
 
[[Category:Project Dandelion]]
 
[[Category:Project Dandelion]]

Revision as of 01:27, 3 April 2010

2010-04-02

  • Photographed whole chassis before removing/disconnecting any parts. Cleaned out all loose paper/foam/etc. Started identifying major components and what the purpose of each is. Photos available in Initial Internal Photos gallery.
  • Removed and wirebrushed card cage fan retention bracket.
  • Reverse engineered a schematic for the power distribution board and created an EAGLE schematic for it.