Line 2: | Line 2: | ||
= Project Status = | = Project Status = | ||
+ | * 2012-02: Parts arrived, board stuffed. Found that wrong power jacks and package for solar charger IC were ordered, waiting on the correct ones now. | ||
+ | * 2012-01: PCB design completed and sent off. | ||
* 2012-01-03: Routing complete, but checklists haven't been run through (other than erc/drc passing) and silkscreen hasn't been added. Sent a pull request to Lisa to merge this back in, which she did. Back to her for the rest of the board tasks! | * 2012-01-03: Routing complete, but checklists haven't been run through (other than erc/drc passing) and silkscreen hasn't been added. Sent a pull request to Lisa to merge this back in, which she did. Back to her for the rest of the board tasks! | ||
* 2012-01-02: LCD we chose was discontinued. Swapped it for a new one, as well as added an expansion connector and changed L1 to a smaller size. Component placement pretty much done, routing started. | * 2012-01-02: LCD we chose was discontinued. Swapped it for a new one, as well as added an expansion connector and changed L1 to a smaller size. Component placement pretty much done, routing started. |
Revision as of 14:18, 21 February 2012
Playameter is a joint project between Lisa and myself to create a weather station designed for use at Burning Man.
Project Status
- 2012-02: Parts arrived, board stuffed. Found that wrong power jacks and package for solar charger IC were ordered, waiting on the correct ones now.
- 2012-01: PCB design completed and sent off.
- 2012-01-03: Routing complete, but checklists haven't been run through (other than erc/drc passing) and silkscreen hasn't been added. Sent a pull request to Lisa to merge this back in, which she did. Back to her for the rest of the board tasks!
- 2012-01-02: LCD we chose was discontinued. Swapped it for a new one, as well as added an expansion connector and changed L1 to a smaller size. Component placement pretty much done, routing started.
- Pre-2012: Lisa did the schematic capture and initial component placement.