− | + | Beacon3 will be a beacon for the top of our flag(less) pole for Burning Man 2011. It will be simpler than [[Beacon2]] as time is limited to get it done, but we want a brighter beacon. | |
+ | |||
+ | == Ideas == | ||
+ | * Less LEDs, but much much brighter. Thinking either a triangle or square with a 1, 3, or 5W RGB LED (either integrated or discrete) on each side. | ||
+ | * Planar PCB that fits onto the spindle, then LED PCBs that plug in vertically seems like it would work | ||
+ | ** LED PCBs may need heat sinks, which could fit into the middle space around the spindle | ||
+ | * Single MCU this time, as there are fewer LEDs | ||
+ | * Same enclosure as [[Beacon2]] can be used to save time, just remove PCBs and replace with these | ||
+ | * Same light sensor and (lack of) charging circuitry as [[Beacon2]] can also be used | ||
+ | |||
+ | == Project Status == | ||
+ | 2011-07-19: Initial design started. |
Revision as of 13:19, 19 July 2011
Beacon3 will be a beacon for the top of our flag(less) pole for Burning Man 2011. It will be simpler than Beacon2 as time is limited to get it done, but we want a brighter beacon.
Ideas
- Less LEDs, but much much brighter. Thinking either a triangle or square with a 1, 3, or 5W RGB LED (either integrated or discrete) on each side.
- Planar PCB that fits onto the spindle, then LED PCBs that plug in vertically seems like it would work
- LED PCBs may need heat sinks, which could fit into the middle space around the spindle
- Single MCU this time, as there are fewer LEDs
- Same enclosure as Beacon2 can be used to save time, just remove PCBs and replace with these
- Same light sensor and (lack of) charging circuitry as Beacon2 can also be used
Project Status
2011-07-19: Initial design started.