Difference between revisions of "Project Checklists"
From Hackstrich
(Make sure test points are on the right side...) |
(Note about making sure not to paste PTH things) |
||
(6 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
+ | == General Notes == | ||
+ | * If any checklist item fails and requires ''any'' change to the design, start that checklist over from the start after the change. | ||
+ | ** Really. It's important. The 2 extra minutes will save re-spinning a board. | ||
+ | * Once checklists are all complete, wait 24 hours and take another brief look at the design before sending to manufacturing. | ||
+ | ** Don't have to re-run checklists, just look it over. It's surprising how many things jump out at you after not looking at a design for awhile. | ||
+ | |||
== Schematic Completion == | == Schematic Completion == | ||
* Does the schematic pass ERC? | * Does the schematic pass ERC? | ||
Line 13: | Line 19: | ||
** 8/16-bit test/debug bus connector for CPLD/FPGA projects that could require logic analyzer connection | ** 8/16-bit test/debug bus connector for CPLD/FPGA projects that could require logic analyzer connection | ||
* Is there a way for the user to receive status information (like LEDs)? | * Is there a way for the user to receive status information (like LEDs)? | ||
− | * Are all nets named something useful (not N$)? Use the SHOW @ N$* command to check. | + | * Are all nets named something useful (not N$)? Use the SHOW @ N$* command to check, if using EAGLE. |
* Are all nets properly classed (if required)? | * Are all nets properly classed (if required)? | ||
* Is there a way to set the address of the board (if on a multidrop bus)? | * Is there a way to set the address of the board (if on a multidrop bus)? | ||
Line 27: | Line 33: | ||
** Do a physical mockup if required to make sure everything fits in properly. | ** Do a physical mockup if required to make sure everything fits in properly. | ||
* Are all connectors on the correct side of the board? | * Are all connectors on the correct side of the board? | ||
+ | * If the design has multiple boards with connectors between them, trace the path of a couple signals and make sure both connectors match up. | ||
* Has the footprint/pinout of any new components been double checked? | * Has the footprint/pinout of any new components been double checked? | ||
− | |||
* Are all sharp bends mitered? | * Are all sharp bends mitered? | ||
* Are all high-speed signals properly laid out? | * Are all high-speed signals properly laid out? | ||
Line 41: | Line 47: | ||
** URL (if possible to fit) | ** URL (if possible to fit) | ||
** Revision number | ** Revision number | ||
+ | ** ECO tracking boxes | ||
** Area for serial number | ** Area for serial number | ||
** Strich | ** Strich | ||
− | * Does text on both sides of the board all face the same direction? | + | * Switch to 3D view (if using Kicad) and check the following: |
+ | ** Does text on both sides of the board all face the same direction? | ||
+ | ** Do labels all appropriately describe what they're next to? | ||
+ | ** Will the test points be easy to get to once the board is stuffed? | ||
== CAM Completion == | == CAM Completion == | ||
Line 54: | Line 64: | ||
* Are required ground ties in place (if required)? | * Are required ground ties in place (if required)? | ||
* Are break-out tabs set up correctly? | * Are break-out tabs set up correctly? | ||
+ | * Does board outline appear correct and contiguous? | ||
+ | * Are slots/cutouts properly set up? | ||
+ | * Are thermal pads left exposed and not covered in solder mask? | ||
+ | * Are PTH pads excluded from paste layers? | ||
[[Category:Notes]] | [[Category:Notes]] |
Latest revision as of 18:05, 30 September 2023
General Notes
- If any checklist item fails and requires any change to the design, start that checklist over from the start after the change.
- Really. It's important. The 2 extra minutes will save re-spinning a board.
- Once checklists are all complete, wait 24 hours and take another brief look at the design before sending to manufacturing.
- Don't have to re-run checklists, just look it over. It's surprising how many things jump out at you after not looking at a design for awhile.
Schematic Completion
- Does the schematic pass ERC?
- Is there a way to power the board?
- Is there a way to program any MCU/CPLD/FPGAs on the board?
- Are all clock signals routed to clock pins (if CPLD/FPGA)?
- Are all MCUs on the board clocked (if required)?
- Are required bypass capacitors included?
- Are any required protection devices (e.g. PTC resettable fuses) included?
- Are required test points included?
- One small SMD point on every net that could conceivably require troubleshooting and does not appear on a connector
- At least one PTH ground test point for scope/logic analyzer probes
- PTH test points for nets that are very likely to require extensive troubleshooting, if space is available
- 8/16-bit test/debug bus connector for CPLD/FPGA projects that could require logic analyzer connection
- Is there a way for the user to receive status information (like LEDs)?
- Are all nets named something useful (not N$)? Use the SHOW @ N$* command to check, if using EAGLE.
- Are all nets properly classed (if required)?
- Is there a way to set the address of the board (if on a multidrop bus)?
- If an Arduino-compatible shield, make sure a reset button and power LED are included.
- Are all connector pins rated for the current they will be carrying?
- Do all specified PMICs have appropriate input voltage ranges, power levels, and topologies?
- Are source/sink-only I/O connectors provided with the correct companion voltages?
PCB Completion
- Is the DRC engine set up to match the board house being used?
- Does the board pass DRC?
- Are all connectors set up so that they won't interfere with each other?
- Do a physical mockup if required to make sure everything fits in properly.
- Are all connectors on the correct side of the board?
- If the design has multiple boards with connectors between them, trace the path of a couple signals and make sure both connectors match up.
- Has the footprint/pinout of any new components been double checked?
- Are all sharp bends mitered?
- Are all high-speed signals properly laid out?
- Is the ground plane set up properly?
- Are QFN/DFN/high-power parts properly thermally laid out?
- Will the board plug into a standard 0.1" perfboard/breadboard (if applicable)?
- Are mounting holes included if required?
- Is the required silkscreen all added?
- Connector/pin descriptions
- Board name
- Copyright/left information
- URL (if possible to fit)
- Revision number
- ECO tracking boxes
- Area for serial number
- Strich
- Switch to 3D view (if using Kicad) and check the following:
- Does text on both sides of the board all face the same direction?
- Do labels all appropriately describe what they're next to?
- Will the test points be easy to get to once the board is stuffed?
CAM Completion
- Do drills line up with pads?
- Are vias tented appropriately?
- Does mask extend between component pins?
- Are test points left exposed on the correct side of the board?
- Do silkscreen layers look reasonable and non-overlapping?
- Does any silkscreen overlap drills?
- Are required ground ties in place (if required)?
- Are break-out tabs set up correctly?
- Does board outline appear correct and contiguous?
- Are slots/cutouts properly set up?
- Are thermal pads left exposed and not covered in solder mask?
- Are PTH pads excluded from paste layers?